Shadowboxers Side to Side and Then We Do It All Over Again
Vinyl siding installation should be left to the pros unless you're confident that you lot take adequate carpentry skills and feel. The upside of doing the projection yourself is that you can cutting the cost of installation to almost half of what you volition likely shell out to hire a contractor. The installation of vinyl siding itself is not that hard, but it does require proper planning also as precise measurements, calculations, cuts and leveling to ensure that the panels fit your wall perfectly.
The steps for vinyl siding installation below assume that you have completed installing the panels for the soffit, which is the underside of the roof overhang, and the fascia, which is the horizontal band along the bottom of the roof. For this project, you will need the following tools:
Power saw Hammer Can snips Utility knife Tape measure Chalk line Level Ladder
Autonomously from vinyl siding panels, the other needed materials are:
Starter strips J-trims Corner moldings Utility trims Drip caps Housewrap and A lot of nails, preferably those with wider heads Plywood
Keep in mind that even many pros prefer non to take this job on alone. Accept ane or two friends help you. In one case yous have all tools and materials listed in a higher place, you're ready to take on this vinyl siding installation DIY.
Pace Remove Obstacles
Articulate the wall of anything that will get in the way of the vinyl siding such equally exterior lamps, retractable clothesline spools, address plates or erstwhile vinyl sidings. Plan the disposal of your old siding properly. Don't mess with utility fixtures or the electric meter. You need to work effectually them.
Take Measurements
Mensurate from the eave down to the bottom where you'll nail the starter strip. Well-nigh vinyl sidings are 12 feet long and 8 inches wide. This means that if the distance between the eave and the lesser is divisible by 8 inches, yous tin can connect your peak console directly to the J-trim. Nigh of the time, however, you will have to modify your last top console and utilize a utility trim to install this final piece.
Observe Your Level Points
Find the level points at the bottom for the starter strip and mark them with the chalk line. Attempt to be equally precise as possible with the level points. This volition make the job easier as you get-go installing the vinyl siding.
Attach the Starter Strip and Vertical Trims
Align the starter strip advisedly along the chalk line and boom it firmly to the wall. Nail 3 ½ inch past ½ inch plywood pieces along the top of the starter strip to brand information technology sturdier and help it hold upward the vinyl siding panels. Next, attach the vertical trims, including the corner posts and finish channels. You may too attach the trims around the windows and doors at this indicate.
Cutting the Vinyl Sidings According to Length
Measure the distance between the vertical finish posts and cut the vinyl panels co-ordinate to length for each row. Let for a ¼ inch distance between the end of the siding and the corner post. Increase the distance to ⅜ inch in areas where the temperatures go as low every bit forty degrees Fahrenheit. Vinyl siding expands and contracts along with temperature fluctuations. The gap volition foreclose impairment to the siding.
Install the Vinyl Sidings
Sheath the first few feet to a higher place the starter strip with the insulation or moisture protection material, and then snap and lock the first vinyl siding row on the starter strip. Nail the panels every maximum of 16 inches on the framing studs or furring on the wall. Information technology is important to remember non to blast the vinyl sidings tightly confronting the wall and position the nail at the center of the slot; go out a ane/32 inch gap between the blast caput and the vinyl siding. You've installed each panel correctly if the siding tin can freely motility from side to side. When you need to overlap panels to span a gap betwixt posts, brand sure that the panels overlap by about an inch. Piece of work your fashion upward effectually the wall cut around doors, windows and lamps using the tin snip.
Terminate Up
As you reach the soffit on the eaves, measure out the width that you demand for the last piece in several locations and modify the vinyl siding panel according to the measurements. Install a J-aqueduct. Make tabs on the cutting edge of the panel every 6 inches using a snap lock dial. Install a utility trim into the J-channel. Lock in the last panel that you have modified on the last row and snap it into the utility trim on top of the wall.